The final transitional Regional Energy Strategic Plan is launched alongside strategic development reports for critical West London substations, marking a busy start to 2026 energy policy…

The new year has proven busy for West London Business and the energy community, with the publication of multiple substation SDPs by SSEN as well as the transitional RESP (Regional Energy Strategic Plan). This is the first key strategy in the journey establishing NESO’s new responsibilities as strategic energy planner for the whole of Great Britain. It lays out strategic investment need over the period between 2028-2033 as we progress towards the development of an ‘enduring RESP’.

West London Business, the region’s business leadership forum, has been proactively engaging with major District Network Operators and National Grid in order to encourage more energy supply for West London at an earlier date than 2037 as is currently targetted. The issue was first raised by our members in 2021 and is a particular challenge in three of our boroughs: Ealing, Hillingdon and Hounslow.

Over the past year we have published these energy updates to provide our members with insights on the key work coordinated alongside strategic partners such as the West London Alliance (WLA) and the Old Oak and Park Royal Development Corporation (OPDC). With the latter, we have been finalising a the Park Royal Power Development study commissioned from WSP. We are now working to translate this into a roadmap for a Smart Local Energy System in Park Royal and advocating for fast upgrades to the low power grid.

In case you’re new to the West London energy scene, you can find a glossary of all key terms here. If you’d prefer a digest version of our updates you can also read our Executive Summary.


2025 was a major milestone year for the UK’s energy transition

We start off this year’s Technical Update with a good news story for the UK’s energy transition, with renewables producing a record 44% of all electricity, the highest ever recorded across a single year. The country also came closer to achieving its Clean Power 2030 target of a zero-carbon electricity system, with the network being run at a record 97.7% of zero carbon sources on April 1st. On average the mixture this year has been 63% zero carbon.

Wind power has provided the largest contribution to this number as the largest source of electricity generation in 2025 for the second year in a row (29.7%), surpassing our usage of gas (26.8%), which primarily comes from UK and Norwegian gas fields. This was also the first calendar year where no coal whatsoever has been used to generate electricity for the country – a major transition milestone.

Figure 1: Contributions of various energy sources to powering the UK electricity network. Credit to NESO.

An interesting point of note in NESO’s 2025 Review was also the variation in the overall demand in electricity across the year – from 12,912 MW at its lowest to nearly 46,000 MW in January, a different of nearly 33,000 MW, up from 30,000 MW in 2024 and reflecting on the amount of flexibility required by the network to support sudden peaks in demand.

Another good news story comes from NESO in late March, as changes to metering rules have now enabled millions of households and businesses across West London and the country as a whole to benefit from greater flexibility measures in how they use electricity. These updates in particular have benefited those who use electric vehicle (EV) chargers, heat pumps or batteries to potentially access lower tariffs or other incentives through energy suppliers.

Read the full article on energy flexibility here >>>


Our Work with NESO

NESO, the National Energy Systems Operator, is a publicly owned organisation established in 2023 under the UK Energy Act that has been taking lead responsibility in assembling formal strategic pathways towards a net zero energy mix under Clean Power 2030.

These Regional Energy Strategic Plans fall underneath the overall Strategic Energy Plan as a direct contrast to the Centralised Strategic Network Plan (CSNP), which is a more long-term coordinated holistic approach to addressing the UK’s energy needs, and which we also consulted on. The RESPs by comparison attack the question of improving energy transmission and capacity from a bottom-up approach, identifying key sites to invest in and prioritise during the next price control period. West London falls within the Greater London RESP.

NESO has been tasked with setting up a Strategic Energy Plan or SEP outlining the country’s pathway towards net zero, which is made up of three separate parts:

  • Strategic Spatial Energy Planning (SSEP) – Spatially maps out the energy assets required nationally to meet 2050 net zero ambitions. The SSEP plots out the methodology that will be utilised to assess what parts of the network will require which assets. Published as of Jan 2025.   
  • Centralised Strategic Network Plan (CSNP) – A whole system level overview of the development plan for high-level investment options for transmission networks. Awaiting final draft.
  • Regional Energy Strategic Plan (RESP) – Focusing on developing the whole system overview from a cross-vector, bottom-up approach with regional plans involving local actors. Published as of Jan 2026.

The final tRESP was published in late January, specifically focused on the next price control period for ED3 between 2028 and 2033 and which we have contributed to significantly in both general consultation in surveys, with the Greater London RESP team directly and in terms of strategic investment need, and we were pleased to see West London’s challenges and methods to address the constraint feature prominently as part of the report:

“West London is a prime example [of how GSPs in the region lack capacity, limiting opportunities to growth and facing significant delays in connecting to the network], with constraints on both transmission and distribution capacity…

…To support strategic planning, the GLA has delivered sub-regional Local Area Energy Plans (LAEP) across Greater London, with the West London subregional LAEP completed in 2022. These sub-regional plans provide London boroughs with the evidence base to develop their own local LAEP, shape local plans and inform distribution network planning.” Section 2

“Phase 1 included:  West London (completed in 2022)…

OPDC, an Opportunity Area in West London, has also completed a full LAEP; however, it is not shown on the map.

Importantly, LAEP outputs are already shaping DNO or Distribution System Operator (DSO) network investments. The GLA, London Councils and boroughs worked alongside DNOs to integrate findings into Distributed Future Energy Scenarios, which were published in 2025.” Section 6

The West London Orbital is also mentioned as one of the three priority projects highlighted by the London Infrastructure Framework (LIF) that we also discuss below.

Read our Phase 1 Local Area Energy Plan (LAEP) >>>

The Greater London RESP team are also planning to host an in person forum on Strategic Energy Need on the 8 June 9:30-4PM, identifying key areas in the GL subregion that will need proactive investment and support. If you are interested in joining WLB in attending this session or have identified particular West London demands we have not yet addressed or do not seem visible in the final tRESP for Greater London, please get in touch with Amy Jiang.

Read the full tRESP >>>

Read the greater London tRESP (incl. West London) >>>


SSEN Strategic Development Plans Published

Alongside the publication of the tRESPs, SSEN (Scottish and Southern Electricity Networks) have also released four relevant West London Grid Supply Point Strategic Development Plans (GSP SDPs) – West London Business initially consulted on these across 2025 during their draft stages, reviewing the reflections that SSEN had made

These Grid Supply Points were:

  • Willesden 
  • Laleham 
  • North Hyde 
  • Iver 66kV 

You can now access the final Strategic Development Plans for each of these grid supply points, as well as all other GSPs in consultation across 2025. We also received this feedback from the SSEN London team:

“The feedback that you have provided through the consultation has been incredibly valuable and has resulted in changes to the SDPs ahead of finalising. A summary of specific changes that have been made to each SDP are tabulated in the appendices of each document.

We identified that some of your feedback relates to the methodology we follow to produce the SDPs. In these cases, we have passed it through and considered in the drafting of our Strategic Development Plan 2026 methodology update (which is now published for consultation here: Survey Details | Strategic Development Plan Methodology Consultation).

Further feedback relates to other SSEN processes that don’t fit within the scope of our SDPs. We are conscious that some recent engagement with our DSO Director…and colleagues in System Planning teams may have resolved this feedback.

In some of the other feedback cases, for example existing generation headroom, we would refer to our current open data offering (including the new Centralised Network View) that may satisfy the data needs of West London Business and their members.

Thank you for your engagement with our SDP consultations, your feedback has been extremely helpful in ensuring our publications are fit for their intended purpose. We wanted to also thank those who have also contributed through your feedback including the WLA, OPDC and the London Borough of Hounslow.”

We will continue to work with SSEN as new GSP SDPs are released, as well as on feedback on factors outside these reports such as on generation headroom with the DSO team and System Planning.

Recently we also submitted a short response to the SSEN ED3 survey in lieu of the electricity distribution final price control framework that was published in April last year. In this short survey, we re-highlighted West London’s major priorities and areas to attention for the DNOs.

Read our ED3 SSEN submission (Member’s Only) >>>

See the new Centralised Network View here >>>

All published Strategic Development Plans >>>


London Infrastructure Framework (LIF)

In March the London Infrastructure Framework was also published, a collaboration between the Mayor of London and the London Councils as a key one-year commitment of the London Growth Plan, which has yet to be fully unveiled.

Priorities included not only support for the thriving AI innovation pipeline developing in the capital, with renowned companies headquarters based in London, but also the supply of new electrical capacity to not impede either the growth of new innovation or the sustaining of present industries that have made their home in the subregion.

Out of four key priority projects, the West London Orbital features at the top of the list.

Read the London Infrastructure Framework >>>


Public release of WLB Data Centres Report

Following on from the LIF launch, West London Business are excited to be launching our final public release of the Data Centres Report, addressing the economic opportunities and challenges that data centres bring to West London over the next few weeks, after consultations across strategic partners, local occupiers and expert advisors in the sector.

We are hoping to follow up the release of this publication with a Data Centre roundtable later in the year, discussing the findings of the report and steps forward for both the Data Centre and other major industries in West London, particularly in Park Royal where data centres have clustered.

You will be able to find the final report in our Media Centre. If you are interested in seeing the final report when it is launched or have any press related queries, please contact Amy Jiang.